Company Name : Tata Projects Ltd.

Job Designation : PROJECT MANAGER (SBU PG )

Qualification : Any Graduate, Any Postgraduate, MBA/PGDM


Level Senior Management

Location Hyderabad Office

POWER GENERATION

Job Description
The candidate should have Techno-commercial background and experience in implementation of large size Thermal Power Plants from concept to commissioning He should have overall idea of Engineering, Planning & Scheduling and execution of the Plant, monitoring site progress, cost control, resource planning and utilization, Negotiating skills both with the client and vendors. He should ensure the deliverables within the cost and time frame set forth.
Experience in execution of Project and Construction management of Coal/gas based Power Plants of 210 / 500 MW and above, in the areas of
(i) “Erection & Commissioning” of Boiler, Turbine & Auxiliaries with associated heavy structures, high pressure Alloy Steel piping involving P-91/P-92 materials. Exposure to welding techniques/entities including Radiography and knowledge of IBR and other International Codes and Standards is a must.
(ii) Implementation and Construction Management of Balance of Plant viz., Coal and Ash Handling plants, Cooling Towers, DM and Water Treatment Plants, Heavy Duty Pumps and Compressors, Air Conditioning, large dia and low pressure piping, Plant electricals viz. Switchgears, Transformers, cabling etc. and Plant Instrumentation systems including DCS.

Candidate Profile Graduate in Engineering

Remuneration Commensurate with experience and qualification.

About us : 
Tata Projects have to their credit of erecting India’s first indigenous 500 MW steam generator at Tata Power’s Trombay power plant near Mumbai and country’s first 500 MW steam turbine at NTPC Rihand nagar for NEI Projects, UK. Currently Tata Projects is associated with installation of 500 MW Steam Generators at NTPC-Talcher (unit IV & VI) – Rihand (Unit- III) and Vindhyachal (Unit IX) for BHEL. This was supplemented by the installation of 120 MW & 210 MW steam generators at Cyprus, Jojobera & Neyveli. The company created a National record at Talcher & Rihand by erecting the steam drum in record time, erecting max. tonnage and max. number of weld joints. Further for the first time in India, Tata Projects have introduced ‘hydraulic strand jacking method’ for lifting of 500 MW steam drum at NTPC, Vindhyachal site. The ESP’s under installation for 500 MW steam Generator at NTPC-Talcher are the highest capacity in the country today.
On successful completion of 37.5 MW Wadi captive power plant for Tata Power in Karnataka in the stipulated cost and time, Currently company is executing the BoP package of 2x210 MW Parichha project in UP and 2x77 MW captive power plant of HZL for BHEL.
Tata Projects is teaming with leading global companies in their efforts to execute mega projects in power generation and it is well justified as an efficient and trustworthy partner for the implementation of larger magnitude projects.

Tata Projects are one among the top players in the field of 400 kV transmission lines and substations paving way for contracts from PGCIL for their Dhauliganga, J&K, Ramagundam, Tarapur and Vishnuprayag projects which are under execution. In addition to these, the company has executed many turnkey electrical projects for various State electricity boards ranging to a wide scope from 33 kV to 400 kV.Tata Projects executes power distribution projects completing all the facet in the power section right from generation to the transmission an
Our core strength - People comprises Engineering professionals with proven track record in Construction Management in the fields of Power Generation / Transmission / Distribution, Industrial Plants, Civil Buildings, Telecom Projects, Process Plants, etc. Qualified and experienced Graduate and Diploma Engineers from Civil, Mechanical, Electrical and Instrumentation disciplines with hands-on experience in the areas listed above may apply on line or against vacancy indicated.

Our company started Third Party Inspection Services business 15 years ago. This business gradually and consistently expanded and has achieved a customer base above 50 and employee strength above 100 and a turnover of 70 million rupees. Indian industry recognizes our services on par with any multinational inspection agencies.
Third Party Inspection and Expediting Services are offered in Power, Cement, Pharmaceutical, Oil & Gas, Petrochemical, Food and Windmill sectors. The range of services rendered are Third Party Inspection and Expediting Services, On-site/ field inspection services, Consultancy services for ISO 9001/ ISO 14001/ OHSAS 18001 and Assessment for Self-Certification capabilities of suppliers. We provide comprehensive service for inspection and expediting in Civil, Mechanical, Electrical & Instrumentation disciplines for the total project as a single window service to the client. Our Major customers include L&T, BHEL, Tata Power, Tata Teleservices, Alstom, Enercon, Suzlon, GE, Powerlinks, BPC

Apply Here 

No comments:

Post a Comment

Please Note: Job Placements in India is not in any way responsible for any consequences of you applying for a job through the vacancies listed on this site. Please do thorough research before applying. We take utmost care in publishing jobs on this site. While every care has been taken to avoid mistakes and errors on the web pages, jobplacements-india.blogspot.com shall not be liable to any person in any manner whatsoever by reason of any error or omission which might have crept in unintentionally